Ansell, M, Holmes, M, Evans, R, Pasquire, C and Price, A (2009) Delivering Best Value in Highways Major Maintenance Schemes: Case Study. Journal of Construction Engineering and Management, 135(04), 235–45.

Dikmen, I, Birgonul, M T and Budayan, C (2009) Strategic Group Analysis in the Construction Industry. Journal of Construction Engineering and Management, 135(04), 288–97.

Goodrum, P M, Zhai, D and Yasin, M F (2009) Relationship between Changes in Material Technology and Construction Productivity. Journal of Construction Engineering and Management, 135(04), 278–87.

Lucko, G (2009) Productivity Scheduling Method: Linear Schedule Analysis with Singularity Functions. Journal of Construction Engineering and Management, 135(04), 246–53.

  • Type: Journal Article
  • Keywords: Scheduling; Critical path method; Network analysis; Geometry; Time dependence; Productivity;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2009)135:4(246)
  • Abstract:
    This paper describes a new integrated method of linear schedule analysis using singularity functions. These functions have previously been used for structural analysis and are newly applied to scheduling. Linear schedules combine information on time and amount of work for each activity. A general model is presented with which activities and their buffers can be mathematically described in detail. The algorithm of the new method forms the body of the paper, including the steps of setting up initial equations, calculating pairwise differences between them, differentiating these to obtain the location of any minima, and deriving the final equations. The algorithm consolidates the linear schedule under consideration of all constraints and, thus, automatically generates the minimum overall project duration. The model distinguishes time and amount buffers, which bears implications for the definition and derivation of the critical path. Future research work will address float and resource analysis using the new model.

Sawhney, A, Walsh, K D, Bashford, H H and Palaniappan, S (2009) Impact of Inspected Buffers on Production Parameters of Construction Processes. Journal of Construction Engineering and Management, 135(04), 319–29.

Shapira, A and Simcha, M (2009) AHP-Based Weighting of Factors Affecting Safety on Construction Sites with Tower Cranes. Journal of Construction Engineering and Management, 135(04), 307–18.

Sobeih, T, Salem, O, Genaidy, A, Abdelhamid, T and Shell, R (2009) Psychosocial Factors and Musculoskeletal Disorders in the Construction Industry. Journal of Construction Engineering and Management, 135(04), 267–77.

Surahyo, M and El-Diraby, T E (2009) Schema for Interoperable Representation of Environmental and Social Costs in Highway Construction. Journal of Construction Engineering and Management, 135(04), 254–66.

Tuholski, S J, Gursel, A P, Tommelein, I D and Bomba, G (2009) “Lean” Comparison Using Process Charts of Complex Seismic Retrofit Projects. Journal of Construction Engineering and Management, 135(04), 330–9.

Wu, M and Lo, H (2009) Optimal Strategy Modeling for Price-Time Biparameter Construction Bidding. Journal of Construction Engineering and Management, 135(04), 298–306.